Skip to main content
Projects

Auckland University of Technology – WG Building

By June 13, 2025February 2nd, 2026No Comments
Get in touch with us (09) 309 5100

Data Infrastructure

  • 180.4km (180,400m) of Copper Cat6a Data Cable connecting to 4,120 outlets
  • 1,015m Fibre Cable connecting 264 outlets

Audio Visual Infrastructure

  • 14.8 km (14,846m) of Copper Cat6a Data Cabling connecting to 418 outlets
  • 2.4 km (2,449m) of Fibre Cable connecting to 116 outlets

Audio Visual Specialist Cable

  • 38.6 km (38,640) of specialist AV Cable connecting to 3814 outlets